Data Center Compliance Checklist

Complete maintenance and compliance checklist for data centers and colocation facilities covering NFPA 75/76 fire protection, ASHRAE TC 9.9 thermal guidelines, TIA-942 infrastructure standards, and EPA environmental regulations. Ensure uptime and compliance.

No email required
Printable format
Updated Feb 2026

The High Stakes of Data Center Operations

Data centers face extraordinary compliance complexity - power, cooling, fire safety, and environmental regulations all intersect. One missed inspection can mean catastrophic downtime or regulatory penalties.

$9,000/min
average downtime cost
Unplanned data center outages cost enterprises $9,000+ per minute (Uptime Institute 2023)
70%
of outages preventable
majority of data center outages are caused by preventable failures in power and cooling
$100K+
EPA violation fines
per day for SPCC and refrigerant management non-compliance
12+
regulatory standards
NFPA, ASHRAE, TIA, OSHA, EPA - complex multi-standard compliance burden

This checklist helps you stay organized. See how to automate it with Infodeck.

Complete Compliance Checklist

Use this checklist to ensure your data center meets NFPA, ASHRAE, TIA-942, OSHA, and EPA requirements. Click any section to expand or collapse.

Fire Detection Systems

Fire Suppression Systems

Emergency Shutdown & Egress

Utility Power & Distribution

Uninterruptible Power Supply (UPS)

Backup Generators

Computer Room Air Conditioning (CRAC/CRAH)

Chilled Water Systems

Environmental Monitoring

Access Control

Surveillance Systems

Perimeter Security

Fuel Storage & Management

Refrigerant Management

Hazardous Materials

General Safety

Electrical Safety

Emergency Preparedness

Structured Cabling

Raised Floor & Containment

Documentation & Compliance

Total inspection items: 150+ tasks across 7 compliance categories
Print this checklist
Smart Automation

Where Sensors Can Do the Work for You

Data center compliance is ideal for IoT automation - continuous environmental monitoring, power infrastructure tracking, and cooling system optimization can all be automated 24/7 with real-time alerts.

Environmental Monitoring

Server inlet points
ASHRAE TC 9.9
Real-time temperature monitoring with automated alerts at 80.6F threshold
Hot aisle containment
ASHRAE TC 9.9
Return air temperature optimization for PUE reduction
Under-floor plenum
Best practice
Pressure differential monitoring for airflow optimization
All zones
ASHRAE TC 9.9
Humidity monitoring (20-80% RH) with dehumidification alerts

Power Infrastructure

UPS systems
TIA-942
Battery health, load percentage, and runtime monitoring
PDUs
TIA-942
Per-circuit power monitoring for capacity planning
Generators
NFPA 110
Fuel level, battery voltage, and run-hour tracking
Electrical panels
NFPA 70B
Thermal monitoring for predictive maintenance

Cooling Infrastructure

CRAC/CRAH units
ASHRAE
Supply/return temps, filter pressure, and runtime hours
Chillers
ASHRAE
kW/ton efficiency, approach temps, and alarm integration
Cooling towers
ASHRAE 188
Water quality, conductivity, and Legionella risk monitoring
Condensate drains
Best practice
Water leak detection and overflow prevention

Fire & Safety

Clean agent cylinders
NFPA 2001
Pressure monitoring with low-pressure alerts
VESDA systems
NFPA 75
Smoke particle trending and threshold alerts
Water detection
Best practice
Under-floor and ceiling water leak detection
Fuel tanks
EPA 40 CFR 112
Level monitoring and leak detection
Implementation Guide

Set Up Compliance Tracking in Infodeck

Follow these steps to automate your data center's compliance program. Each inspection from the checklist above becomes a scheduled, tracked, and documented task.

1

Create Recurring Work Orders by Frequency

Group compliance tasks by frequency and create recurring work orders. Infodeck auto-generates them on schedule.

Weekly: Generator Test
NFPA 110 compliance
Monthly: UPS Battery Check
TIA-942 requirement
Annual: Fire Suppression Test
NFPA 2001 certified
2

Connect IoT Sensors for Continuous Monitoring

Temperature sensors for ASHRAE compliance, power meters for capacity planning, and environmental monitors for cooling optimization. Smart Workflows create work orders when thresholds are exceeded.

IF server inlet temp > 80.6F then Create work order and Alert NOC team
3

Generate Audit-Ready Reports

When auditors, fire marshals, or EPA inspectors arrive, export complete compliance history with one click. All inspections, sensor readings, and corrective actions documented for Uptime Institute, SOC 2, or regulatory audits.

Ready to Automate Data Center Compliance?

Get the printable checklist now, or start automating your compliance tracking with Infodeck's 30-day free trial.

Free Resource

Download Checklist

Print / Save PDF

No email required

Start Automating

Try Infodeck Free

Start Free Trial

30 days free, no credit card

Want a personalized demo for your data center operation?

Book a Demo

Regulatory Sources

Disclaimer

This checklist is provided as a general guide for data center compliance based on the sources cited above. Requirements vary by state, local jurisdiction, and facility tier level. Always verify specific requirements with your local fire marshal, Authority Having Jurisdiction (AHJ), and applicable certification bodies (Uptime Institute, etc.).

Last updated: February 2026 | Region: United States