Canadian Data Center Compliance Checklist
Complete inspection checklist covering NFC 2020 fire suppression, CSA electrical standards, ASHRAE TC 9.9 cooling guidelines, TIA-942 infrastructure requirements, and environmental compliance. Be audit-ready for your data centre inspections.
The Hidden Cost of Manual Compliance
Canadian data centres must comply with NFC fire codes, CSA electrical standards, ASHRAE thermal guidelines, and TIA-942 infrastructure requirements - each with different frequencies and documentation needs.
This checklist helps you stay organised. See how to automate it with Infodeck.
Complete Canadian Compliance Checklist
Use this checklist to ensure your Canadian data centre facilities meet all regulatory requirements. Click any section to expand or collapse.
Fire Detection Systems
Fire Suppression Systems
Emergency Shutdown & Egress
Utility Power & Distribution
Uninterruptible Power Supply (UPS)
Backup Generators
Computer Room Air Conditioning (CRAC/CRAH)
Chilled Water Systems
Environmental Monitoring
Access Control
Surveillance Systems
Perimeter Security
Fuel Storage & Management
Refrigerant Management
Hazardous Materials
General Safety
Electrical Safety
Emergency Preparedness
Structured Cabling
Raised Floor & Containment
Documentation & Compliance
Where Sensors Can Do the Work for You
Many compliance checks can be automated with IoT sensors - collecting data 24/7, triggering alerts when thresholds are exceeded, and automatically creating work orders for your team.
Environmental Monitoring
Power Infrastructure
Cooling Infrastructure
Fire & Safety
Ready to Automate Data Centre Compliance?
Get the printable checklist now, or start automating your compliance tracking with Infodeck's 30-day free trial.
Want a personalised demo for your Canadian data centre?
Book a DemoDisclaimer
This checklist is based on Canadian standards including NFC 2020, CSA Standards (C22.1, C282, Z462), ASHRAE TC 9.9 thermal guidelines, TIA-942 infrastructure requirements, and provincial environmental regulations. Requirements may vary by province and specific data centre classification. Always verify specific requirements with your local authorities and certification bodies.
Sources
- National Fire Code of Canada (NFC 2020)
- CSA C22.1 Canadian Electrical Code
- CSA C282 Emergency Generator Sets
- ASHRAE TC 9.9 Thermal Guidelines
- TIA-942 Data Center Standards
- CCOHS Workplace Safety
- Uptime Institute
Last updated: February 2026